Pajarito Rio Puerco

Rio Puerco-Pajarito-Prosperity 345kV Transmission Line Project

What is the Rio PuercoPajaritoProsperity 345kV Transmission Line Project?

Join PNM Experts for an Informational Open House

Thursday, July 17, 2025
5:30 7:30 PM

Central & Unser Public Library
8081 Central Ave NW
Albuquerque NM 87121

The Rio-Puerco¿Pajarito¿Prosperity 345kV Transmission Line Project is a vital infrastructure initiative aimed at addressing critical regional energy challenges while creating opportunities for growth and sustainability. This project plays a key role in enhancing the reliability and resilience of the electric grid, supporting the integration of renewable energy sources, and modernizing the transmission system to meet energy demand. Through the construction of this high-voltage transmission line, PNM is committed to delivering safe, reliable energy and establishing a strong foundation for a more sustainable and efficient energy future.

Download Fact Sheet

Project Purpose and Need

The Rio PuercoPajaritoProsperity 345kV Transmission Line is a new transmission line In Sandoval and Bernalillo counties.

This project addresses regional energy challenges and opportunities:

  • Improve system reliability and resilience
  • Support renewable generation
  • Modernize grid to meet energy demand

Route Evaluation

Route options are evaluated using technical, environmental, cultural, existing & planned land-use, and public feedback.

Project Purpose and Need

Routing Process

PNM is conducting a routing study to identify a route for the new transmission line. Input from communities, landowners, and Tribal Nations helps identify local values and concerns, allowing PNM to refine routes.

Define Needs & Objectives
Develop Preliminary Routes
WE ARE HERE Analyze & Evaluate Routes
Select Preferred Route
Report and Submit for Approval

Cultural Resource Preservation

Preserving cultural heritage is a shared responsibility that begins with meaningful collaboration and continues through respectful planning and protective action. This framework outlines key principles that guide efforts to engage communities, honor sacred spaces, and safeguard cultural resources throughout development and construction processes.

Environmental Considerations

The Rio PuercoPajaritoProsperity 345kV Transmission Line is taking into consideration the following items:

ENGAGE:

Early and ongoing collaboration with Tribal nations and community stakeholders

RESPECT:

Avoidance of cultural sites

PROTECT:

Cultural surveys and monitoring during construction to safeguard resources

Timeline

The Rio-PuercoPajaritoProsperity 345kV Transmission Line Project is anticipated to continue through 2029. Below you can see what our expected timeline is.

WE ARE HERE

Public Outreach

Provide information to and gather feedback from the community

2025

Route Evaluation

Performing engineering & environmental studies and obtaining public input

2025

Regulatory Review

Application is submitted to Public Regulatory Commission for review

2025

Construction Starts

Work activities start with site preparation

2026-2029

Energize Transmission Line

Construction complete; line energized & perform site restoration

2026-2029
H-frame

What are PNM's typical 345kV Structures and Spans?

TYPICAL STRUCTURE:
Tubular H-Frame

TYPICAL MATERIAL:
Steel

TYPICAL HEIGHT RANGE:
80-125 feet

TYPICAL SPANS:
750-850 feet

How will PNM use the right-of-way?

The right-of-way helps ensure safe and reliable operation of the transmission line while minimizing impacts to surrounding land.

How will PNM use the right-of-way?