ESG Meter Drawings - pnmprod
Electric Service Guide - Meter Drawings & Equipment
General Standard and Requirements 
Complete set of meter drawings 
PNM Approved Meter Equipment 2025 
Individual Meter Drawings
- 2,3 or 4 Wire, 120/240V, Single Three-Phase MS-1-27.0
 - REC Meter Socket MS-1-28.0
 - 277/480V Four-Wire Wye MS-1-29.0
 - 120/240V 125/200A Permanent Overhead and Underground Single-Phase Meter Socket: MS-2-2.0
 - 120/240V 100-125A Temporary Single-Phase Meter Socket: MS-2-2.3
 - 240V 200A Single-Phase Meter Socket: MS-2-2.5
 - 120/240V 125/200A Single-Phase Multi-Meter Socket: MS-2-3.0
 - 120/240V 125/200A Residential Single-Phase Multi-Meter Socket: MS-2-4.0
 - 120/240V 200A Single-Phase Meter Socket with Bypass Handle: MS-2-5.0
 - 200A Three-Phase Four-Wire Wye or Delta Meter Socket: MS-2-6.0
 - 200A Three-Phase Four-Wire Wye 277/480V Wye Meter Socket MS-2-6.3
 - Single-Phase Six-Terminal CT Meter Socket: MS-2-6.5
 - Three-Phase Thirteen-Terminal CT Meter Socket: MS-2-7.0
 - Ringless Trans Socket: MS-2-8.0
 - 240V 200A Single-Phase Combo Meter Socket: MS-2-9.0
 - 120/240V 100A Small Cell Metering Enclosure: MS-2-9.3
 - 240V 320A Single-Phase Combo Meter Socket Underground Residential Only: MS-2-9.5
 - 320A Meter Socket with Bypass: MS-2-10.0
 - Double-Window Three-Phase Instrument Transformer and Meter Enclosure: MS-3-2.0
 - Recording Meter Instrument Transformer Enclosure: MS-3-3.0
 - Over 320A 240V Single-Phase Meter Option: MS-3-7.0
 - Over 200A Three-Phase Overhead Meter Options: MS-3-7.5
 - Over 200A Three-Phase Underground Meter Options: MS-3-8.0
 - 277/480V Instrument Transformer and Meter Enclosure for Meter Network: MS-3-9.0
 - Three-Phase Bushing CT Meter Installation: MS-3-10.0
 - Optional Equipment to Provide Meter Data for Customer Use: MS-3-12.0
 - 7200/12470V CT and PT Meter Enclosure: MS-3-17.0
 - Primary CT Taping Procedure: MS-3-19.0
 - 7200/12470V CT and PT Meter Enclosure Mounts: MS-3-20.0
 - 7200/12470V CT and PT Enclosure Pad: MS-3-21.0
 - 120/240V Single-Phase Four-Terminal Modular Meter and Equipment: MS-4-1.0
 - 120/208V Five-Terminal Modular Meter and Equipment: MS-4-2.0
 - 120/208-277/480V 200A Three-Phase Four-Wire Multiple Meter: MS-4-3.0
 - 120/208-277/480V Three-Phase Four-Wire Multiple Meter: MS-4-4.0
 - Rain Tight Housing for Switchgear and Meter: MS-4-5.0
 - Switchgear Meters with Padmount Transformer: MS-4-7.0
 - Switchgear Seven-Jaw Socket Meter: MS-4-8.0
 - Cradle Mount CT Switchgear Metering: MS-4-9.0
 - 120/208 or 277/480V Switchgear Metering: MS-4-11.0
 - 120/240V 125 to 200A Rated Socket Pedestal Meter MS-5-1.5 p1
 - 120/240V 125 to 200A Rated Socket Pedestal Meter MS-5-1.5 p2
 - 120/240V 320A Pedestal Meter: MS-5-2.0
 - Permanent Single-Phase or Three-Phase Pedestal Meter: MS-5-3.0
 - Three-Phase or Single-Phase, Overhead or Underground Field Build Structure: MS-5-4.0
 - Over 200A Permanent Three-Phase Pedestal Meter: MS-5-5.0
 - 240V Single-Phase Commercial Pedestal Meter: MS-5-6.0
 - Underground or Overhead Working Space for Electric Meter: MS-7-1.0
 - Underground or Overhead Working Space for REC Meter: MS-7-1.5
 - Location and Placards for REC Meter: MS-7-1.6
 - Location and Placards for ESS Meter: MS-7-1.7
 - Working Space Required for Meter Enclosure: MS-7-2.0
 - REC Meter Base Standard 120/240V Meter Base - Neutral NOT bonded: MS-8-1.0
 - Third Party Meter with REC Meter Base Standard 120V Meter Base: MS-8-1.1
 - Third Party Meter REC Meter Base Standard 240V Meter Base - Neutral NOT Bonded: MS-8-1.2
 - REC Meter Base Standard 240V Meter Base without Neutral: MS-8-1.5
 - 120/240 100-150A Single-Phase REC Meter Socket for Renewable Systems Less Than 10kW: MS-8-2.0
 - 240V 200A Customer Overhead or Underground SIngle-Phase Meter Socket 10.1 kW or Greater: MS-8-2.5
 - 277/480V, 120/208V Four-Wire Ground Wye 1 Inverter, 3 Outputs without Neutral: MS-8-3.0
 - 277/480V, 120/208V Four-Wire Ground Wye 1 Inverter, 3 Outputs with Neutral: MS-8-3.3
 - 277/480V, 120/208V Four-Wire Ground Wye 3 Inverters, 3 Outputs with Neutral: MS-8-3.7
 - 7200/12470V Primary REC Meter Enclosure: MS-8-5.0
 - Over 200A Three-Phase REC Meter Options: MS-8-6.0
 - Over 200A Three-Phase Overhead Meter: MS-8-6.5
 - Underground or Overhead Workign Space for REC Meter: MS-8-11.0
 - Location and Placards for REC Meter: MS-8-12.0
 - Location and Placards for Disconnect; 10kV AC Systems and Less: MS-8-12.1
 - Location and Placards for ESS Meter: MS-8-13.0